Zero positioning installation and introduction

 Loaded in CNC, EDM, CMM equipment, equipped with a set of MTS chuck, two sets of pallets, one set of pallets is processed in the machine, and the other set is pre-set outside the machine to install the workpiece to be processed, and install the chuck on the equipment The calibration center value is fixed, and there is no need to print the meter in the machine for the following workpieces, which effectively reduces the downtime of the equipment.


The workpiece is installed on the pallet, and the direction and center can be waited for processing in the pre-adjustment. The pre-adjustment of the workpiece outside the machine reduces the downtime of the equipment by 90%, reduces human errors and reduces the rate of defective products. Improve work efficiency and reduce production costs.


It takes about 60 seconds to wait for the replacement on the equipment. The workpiece and the pallet can be installed on any equipment equipped with a chuck, and the positioning is repeated, and the positioning accuracy is ±0.01mm.

MTS chuck

评论